
Implementation period1 year
Total area of the building4,987 m²
Task statement
Reconstruction of an early 20th-century administrative building for office use (without altering the building’s façade appearance).
Solution
The reconstruction was carried out internally, including installation of new monolithic floor slabs and staircases, reinforcement of walls and foundations. A 5th attic floor was added to the building. A full-scale façade renovation was performed.


